Structures
Frazier to Cruzatte


Rockshed between Tunnels 12 and 13. This view is from the east switch Heather.

East end of Rockshed #12, between Tunnels 12 & 13.
West end of Rockshed with Tunnel #12 in the distance.
The inside picture.




Click HERE to view tunnel 13

Click HERE to view tunnel 12



Concrete slab bridge Side Canyon Bridge and Tunnel 11.
East portal, tunnel 11.
Slab bridge under tunnel 11 portal.
East portal, tunnel 11.
Tunnel 11

Click HERE to view the ICC Valuation report for Side Canyon Bridge.




Click HERE to view tunnel 11

Click HERE to view tunnel 10







Click the photo to view the Noisy Creek Bridge Page.




Click HERE to view tunnel 9



Slab bridge between Tunnels 8 and 9 looking toward Tunnel #8.
Slab bridge between Tunnels 8 and 9 looking toward Tunnel #9.




Click HERE to view tunnel 8




Click the photo to view more of Shady Creek Bridge.




Click HERE to view tunnel 7



Rockshed at the west portal of Tunnel #7. This structure was never completed.
East end of Rockshed looking west toward Tunnel #6 and Cruzatte.
East end of Rockshed. Rebar can still be seen sticking out from the top of the wall in the right of the photo.





Click HERE to view tunnel 6



© Joel Ashcroft