1 Account No. 5 Title Tunnels and Subways




2 Tunnel No.12 MP 549.3 Single Track Driven




3 Total Length 360ft. (sta. "G" 923+85 to "G" 920+25)




4 Lined Length concrete-96 ft. per plans 18653 & C.S.347




5 Lined Length timber-339 ft.




6 Two concrete portals, plans 18247,40482 & 40484




7 Excavation-Common
Cu Yd 13 .24 3
8 Excavation-Loose rock
" 13 .49 6
9 Excavation-solid rock
" 6,676 3.70 24,701
10 Portal backfill-common
" 103 .24 25

11 -Lining-




12 ...Reinforced concrete 1926 " 466 13.00 6,058
13 ...Plain concrete " " 168 11.50 1,932
14 ...Timber-untreated fir " m.b.m. 123.128 40.00 4,925
15 ...Timber-Redwood " " 3.015 45.00 136

16 Packing-cordwood " cord 96 7.00 672
17 Reinforcing bars " lbs. 20,963 .04 839
18 Iron " " 1,606 .05 80
19 Creosote paint " gallon 93 .70
20 Tunnel Sign-C.S. 9 " Each 2 1.00 2
21 Pump fire extinguisher (5 gallon Pyrene) 1927 " 2 20.00 40
22 Fire Ladders 24 ft. " " 2 6.00 12
23 Fire Ladders 16 ft. " " 1 4.00 4
24 Fire barrels & covers-concrete " " 4 5.00 20
25 Fire buckets-metal, cone shaped " " 8 .25 2
26 Axes, single bitt " " 2 1.00 2

27 ..........Total

$53,941.32
28 ..........Interest during construction

$2,951.01
29 ..........Final

$56,892.33