Tunnel #9


East portal of Tunnel #9.



West Portal of Tunnel #9.

ICC Valuation Report

Statement showing property changes from September 1, 1926, to December 31, 1927

line
#
Character of property and description
Date
Units
Number of
units
Cost/unit
$$$
Total
$$$
1 Account No. 5 Title Tunnels and Subways




2 Tunnel No.9 MP 548.3 Single Track Driven




3 Total Length 1144ft. (sta. "G" 873+75 to "G" 862+20)




4 Lined Length concrete-113 ft. per plans 18653 & C.S.347




5 Lined Length timber-981 ft.




6 Two concrete portals, plans 18247,40541 & 40543




7 Excavation-common
Cu Yd 9 .24 2
8 Excavation-Loose rock
" 9 .49 4
9 Excavation-solid rock
" 21,575 3.70 79,828
10 Excavation-solid rock (invert)
" 47 2.50 118
11 Overhaul
Cu Yd Sta 14,059 0.0125 176

12 -Lining-




13 ...Reinforced concrete 1926 Cu Yd 459 13.00 5,967
14 ...Plain concrete " " 293 11.50 3,370
15 ...Plain concrete (invert) " " 40 11.50 460
16 ...Timber-untreated fir " m.b.m. 415.102 40.00 16,604
17 ...Timber-Redwood " " 5.940 45.00 267

18 Packing-cordwood " cord 431 7.00 3,017
19 Portal backfill-common
Cu Yd 775 .24 186
20 Portal backfill-Loose rock
" 11 .49 5
21 Reinforcing bars 1926 lbs. 35,346 .04 1,414
22 Iron " " 2,886 .05 144
23 Creosote paint " gallon .70 199
24 Tunnel Sign-C.S. 9 " Each 2 1.00 2
25 Pump fire extinguisher (5 gallon Pyrene) 1927 " 2 20.00 40
26 Fire Ladders 24 ft. " " 2 6.00 12
27 Fire Ladders 16 ft. " " 1 4.00 4
28 Fire barrels & covers-concrete " " 4 5.00 20
29 Fire buckets-metal, cone shaped " " 8 .25 2
30 Axes, single bitt " " 2 1.00 2

31 ..........Total

$144,087.63
32 ..........Interest during construction

$7,892.30
33 ..........Final

$151,979.93

© Joel Ashcroft