Tunnel #5


East Portal of Tunnel #5.




West Portal of Tunnel #5.


ICC Valuation Report

Statement showing property changes from September 1, 1926, to December 31, 1927

line
#
Character of property and description
Date
Units
Number of
units
Cost/unit
$$$
Total
$$$
1 Account No. 5 Title Tunnels and Subways




2 Tunnel No.5 MP 545.2 Single Track Driven




3 Total Length 964 ft. (sta. "AL" 710+96 to "AL" 701+32)




4 Lined Length concrete-188 ft. per plans 18653, 20111 & C.S.347




5 Lined Length timber-909 ft.




6 Two concrete portals, plans 18247,40476 & 40477




7 Excavation-common
Cu Yd 8 .24 2
8 Excavation-solid rock
" 19,085 3.70 70,615
9 Portal backfill-common (local)
" 635 .24 152
10 Portal backfill-loose rock (local)
" 12 .49 6
11 Riprap-handplaced (Portal protection) 1926 " 110 2.00 220
12 Overhaul
Cu Yd Sta 254,395 .0125 3,180

13 -Lining-




14 ...Reinforced concrete 1926 Cu Yd 703 13.00 9,139
15 ...Plain concrete " " 301 11.50 3,462
16 ...Timber-untreated fir " m.b.m. 401.503 40.00 16,060
17 ...Timber-Redwood " " 5.190 45.00 234

18 Packing-cordwood " cord 1250 7.00 8,750
19 Reinforcing bars " lbs. 46,488 .04 1,860
20 Iron " " 4,631 .05 232
21 Creosote paint " gallon 250 .70 175
22 Tunnel Sign-C.S. 9
Each 2 1.00 2
23 Pump fire extinguisher (5 gallon Pyrene) 1927 " 2 20.00 40
24 Fire Ladders 24 ft. " " 2 6.00 12
25 Fire Ladders 16 ft. " " 1 4.00 4
26 Fire barrels & covers-concrete " " 4 5.00 20
27 Fire buckets-metal, cone shaped " " 8 .25 2
28 Axes, single bitt " " 2 1.00 2

29 ..........Total

$152,243.06
30 ..........Interest during construction

$8,339.34
31 ..........Final

$160,582.40