Tunnel #4


West portal of Tunnel #4




East portal of Tunnel #4


ICC Valuation Report

Statement showing property changes from September 1, 1926, to December 31, 1927

line
#
Character of property and description
Date
Units
Number of
units
Cost/unit
$$$
Total
$$$
1 Account No. 5 Title Tunnels and Subways




2 Tunnel No.4 MP 544.3 Single Track Driven




3 Total Length 698 ft. (sta. "D" 661+68 to "D" 654+70)




4 Lined Length concrete-96 ft. per plans 18653 & C.S.347




5 Lined Length timber-679 ft.




6 Two concrete portals, plans 18247,40478 & 40479




7 Excavation-common
Cu Yd 9 .24 2
8 Excavation-solid rock
" 14,768 3.70 54,642
9 Portal backfill-loose rock
" 17 .49 8
10 Overhaul
Cu Yd Sta 53,595 .0125 670

11 -Lining-




12 ...Reinforced concrete 1926 Cu Yd 415 13.00 5,395
13 ...Plain concrete " " 106 11.50 1,219
14 ...Timber-untreated fir " m.b.m. 229.913 40.00 9,197
15 ...Timber-Redwood " " 5.035 45.00 227

16 Packing-cordwood " cord 328 7.00 2,296
17 Reinforcing bars " lbs. 19,348 .04 774
18 Iron " " 1,539 .05 77
19 Creosote paint
gallon 171 .70 120
20 Tunnel Sign-C.S. 9
Each 2 1.00 2
21 Pump fire extinguisher (5 gallon Pyrene) 1927 Each 2 20.00 40
22 Fire Ladders 24 ft. " " 2 6.00 12
23 Fire Ladders 16 ft. " " 1 4.00 4
24 Fire barrels & covers-concrete " " 4 5.00 20
25 Fire buckets-metal, cone shaped " " 8 .25 2
26 Axes, single bitt " " 2 1.00 2

27 ..........Total

$98,750.43
28 ..........Interest during construction

$5,407.18
29 ..........Final

$104,157.61