Tunnel #21


East Portal of Tunnel #21.




West portal of Tunnel #21.

ICC Valuation Report

7

Statement showing property changes from September 1, 1926, to December 31, 1927

line
#
Character of property and description
Date
Units
Number of
units
Cost/unit
$$$
Total
$$$
1 Account No. 5 Title Tunnels and Subways




2 Tunnel No.21 MP 572.1 Single Track Driven




3 Total Length 460ft. (sta. "H" 60+76 to "H" 65+12)




4 Lined Length concrete-100 ft. per plans 18653




5 Lined Length timber-405 ft.




6Two concrete portals, plans 18247,40107 & 40109




7 Excavation-loose rock
Cu Yd 120 .49 59
8 Excavation-solid rock
" 8,903 3.70 32,941
9 Overhaul
Cu Yd Sta 734 0.0125 9
10 Portal backfill-common Avg Haul 4 mi.
Cu Yd 163 .24 39

11 -Lining-




12 ...Plain concrete " " 781 11.50 8,982
13 ...Timber-untreated fir " m.b.m. 57.644 40.00 2,306
14 ...Timber-untreated cedar " " 98.304 45.00 4,424

15 Packing-cordwood " cord 135 7.00 945
16 Riprap-Hand Placed " Cu Yd 42 2.00 84
17 Iron " lbs 626 .05 31
18 Creosote paint " gallon 45 .70 32
19 Tunnel Sign-C.S. 9 " Each 2 1.00 2
20 Pump fire extinguisher (5 gallon Pyrene) 1927 " 2 20.00 40
21 Fire Ladders 24 ft. " " 2 6.00 12
22 Fire Ladders 16 ft. " " 1 4.00 4
23 Fire barrels & covers-concrete " " 4 5.00 20
24 Fire buckets-metal, cone shaped " " 8 .25 2
25 Axes, single bitt " " 2 1.00 2

26 ..........Total

$75,128.74
27 ..........Interest during construction

$3,709.27
28 ..........Final

$78,838.01