Statement showing property changes from September 1, 1926, to December 31, 1927 |
||||||
line |
Character of property and description |
Date |
Units |
Number of |
Cost/unit |
Total |
1 | Account No. 5 Title Tunnels and Subways | |||||
2 | Tunnel No.21 MP 572.1 Single Track Driven | |||||
3 | Total Length 460ft. (sta. "H" 60+76 to "H" 65+12) | |||||
4 | Lined Length concrete-100 ft. per plans 18653 | |||||
5 | Lined Length timber-405 ft. | |||||
6 | 7Two concrete portals, plans 18247,40107 & 40109 | |||||
7 | Excavation-loose rock | Cu Yd | 120 | .49 | 59 | |
8 | Excavation-solid rock | " | 8,903 | 3.70 | 32,941 | |
9 | Overhaul | Cu Yd Sta | 734 | 0.0125 | 9 | |
10 | Portal backfill-common Avg Haul 4 mi. | Cu Yd | 163 | .24 | 39 | |
11 | -Lining- | |||||
12 | ...Plain concrete | " | " | 781 | 11.50 | 8,982 |
13 | ...Timber-untreated fir | " | m.b.m. | 57.644 | 40.00 | 2,306 |
14 | ...Timber-untreated cedar | " | " | 98.304 | 45.00 | 4,424 |
15 | Packing-cordwood | " | cord | 135 | 7.00 | 945 |
16 | Riprap-Hand Placed | " | Cu Yd | 42 | 2.00 | 84 |
17 | Iron | " | lbs | 626 | .05 | 31 |
18 | Creosote paint | " | gallon | 45 | .70 | 32 |
19 | Tunnel Sign-C.S. 9 | " | Each | 2 | 1.00 | 2 |
20 | Pump fire extinguisher (5 gallon Pyrene) | 1927 | " | 2 | 20.00 | 40 |
21 | Fire Ladders 24 ft. | " | " | 2 | 6.00 | 12 |
22 | Fire Ladders 16 ft. | " | " | 1 | 4.00 | 4 |
23 | Fire barrels & covers-concrete | " | " | 4 | 5.00 | 20 |
24 | Fire buckets-metal, cone shaped | " | " | 8 | .25 | 2 |
25 | Axes, single bitt | " | " | 2 | 1.00 | 2 |
26 | ..........Total | $75,128.74 | ||||
27 | ..........Interest during construction | $3,709.27 | ||||
28 | ..........Final | $78,838.01 |