| Tunnel #19 |

West portal of Tunnel #19
Statement showing property changes from September 1, 1926, to December 31, 1927 |
||||||
line |
Character of property and description |
Date |
Units |
Number of |
Cost/unit |
Total |
| 1 | Account No. 5 Title Tunnels and Subways | |||||
| 2 | Tunnel No.19 MP 558.6 Single Track Driven | |||||
| 3 | Total Length 363ft. (sta. "H" 779+05 to "H" 782+68) | |||||
| 4 | Lined Length concrete-130 ft. per plans 18653 & C.S.347 | |||||
| 5 | Lined Length timber-295 ft. | |||||
| 6 | Two concrete portals, plans 18247,40137 & 40480 | |||||
| 7 | Excavation-common | Cu Yd | 34 | .24 | 8 | |
| 8 | Excavation-solid rock | " | 7,237 | 3.70 | 26,777 | |
| 9 | Portal backfill-common | " | 283 | .24 | 68 | |
| 10 | Portal backfill-solid rock | " | 37 | .99 | 37 | |
| 11 | -Lining- | |||||
| 12 | ...Reinforced concrete | 1926 | " | 550 | 13.00 | 7,150 |
| 13 | ...Plain concrete | " | " | 334 | 11.50 | 3,841 |
| 14 | ...Timber-untreated fir | " | m.b.m. | 112.821 | 40.00 | 4,513 |
| 15 | ...Timber-Redwood | " | " | 2.800 | 45.00 | 126 |
| 16 | Packing-cordwood | " | cord | 67 | 7.00 | 469 |
| 17 | Reinforcing bars | " | lbs. | 28,350 | .04 | 1,134 |
| 18 | Iron | " | " | 1,386 | .05 | 69 |
| 19 | Creosote paint | " | gallon | 79 | .70 | 55 |
| 20 | Tunnel Sign-C.S. 9 | " | Each | 2 | 1.00 | 2 |
| 21 | Pump fire extinguisher (5 gallon Pyrene) | 1927 | " | 2 | 20.00 | 40 |
| 22 | Fire Ladders 24 ft. | " | " | 2 | 6.00 | 12 |
| 23 | Fire Ladders 16 ft. | " | " | 1 | 4.00 | 4 |
| 24 | Fire barrels & covers-concrete | " | " | 4 | 5.00 | 20 |
| 25 | Fire buckets-metal, cone shaped | " | " | 8 | .25 | 2 |
| 26 | Axes, single bitt | " | " | 2 | 1.00 | 2 |
| 27 | ..........Total | $61,195 | ||||
| 28 | ..........Interest during construction | $3,348.65 | ||||
| 29 | ..........Final | $64,544.26 | ||||