ICC Valuation Report

Statement showing property changes from September 1, 1926, to December 31, 1927

line
#
Character of property and description
Date
Units
Number of
units
Cost/unit
$$$
Total
$$$
1 Account No. 5 Title Tunnels and Subways




2 Tunnel No.19 MP 558.6 Single Track Driven




3 Total Length 363ft. (sta. "H" 779+05 to "H" 782+68)




4 Lined Length concrete-130 ft. per plans 18653 & C.S.347




5 Lined Length timber-295 ft.




6 Two concrete portals, plans 18247,40137 & 40480




7 Excavation-common
Cu Yd 34 .24 8
8 Excavation-solid rock
" 7,237 3.70 26,777
9 Portal backfill-common
" 283 .24 68
10 Portal backfill-solid rock
" 37 .99 37

11 -Lining-




12 ...Reinforced concrete 1926 " 550 13.00 7,150
13 ...Plain concrete " " 334 11.50 3,841
14 ...Timber-untreated fir " m.b.m. 112.821 40.00 4,513
15 ...Timber-Redwood " " 2.800 45.00 126

16 Packing-cordwood " cord 67 7.00 469
17 Reinforcing bars " lbs. 28,350 .04 1,134
18 Iron " " 1,386 .05 69
19 Creosote paint " gallon 79 .70 55
20 Tunnel Sign-C.S. 9 " Each 2 1.00 2
21 Pump fire extinguisher (5 gallon Pyrene) 1927 " 2 20.00 40
22 Fire Ladders 24 ft. " " 2 6.00 12
23 Fire Ladders 16 ft. " " 1 4.00 4
24 Fire barrels & covers-concrete " " 4 5.00 20
25 Fire buckets-metal, cone shaped " " 8 .25 2
26 Axes, single bitt " " 2 1.00 2

27 ..........Total

$61,195
28 ..........Interest during construction

$3,348.65
29 ..........Final

$64,544.26