tunnel #16


West portal of Tunnel 16.

ICC Valuation Report

Statement showing property changes from September 1, 1926, to December 31, 1927

line
#
Character of property and description
Date
Units
Number of
units
Cost/unit
$$$
Total
$$$
1 Account No. 5 Title Tunnels and Subways




2 Tunnel No.16 MP 556.0 Single Track Driven




3 Total Length 2213ft. (sta. "H" 899+12 to "H" 921+25)




4 Lined Length concrete-778 ft. per plans 18653 & C.S.347




5 Lined Length timber-2192 ft.




6 Two concrete portals, plans 18247,40562 & 40564




7 Excavation-Common
Cu Yd 73 .24 18
8 Excavation-Common (invert)
" 291 .24 70
9 Excavation-Loose rock
" 134 .49 66
10 Excavation-solid rock
" 42,991 3.70 159,067
11 Excavation-solid rock (invert)
" 291 2.50 728
12 Overhaul
Cu Yd Sta 302,581 .0125 3,782
13 Portal backfill-common
Cu Yd 80 .24 19
14 Portal backfill-Loose rock
" 240 .49 118

15 -Lining-




16 ...Reinforced concrete 1926 " 3,567 13.00 46,371
17 ...Plain concrete " " 451 11.50 5,187
18 ...Plain concrete (invert) " " 468 11.50 5,382
19 ...Timber-untreated fir " m.b.m. 1023.761 40.00 40,950
20 ...Timber-Redwood " " 35.250 45.00 1,586

21 Packing-cordwood " cord 1,205 7.00 8,435
22 Reinforcing bars " lbs. 207,178 .05 10,359
23 Iron " " 12,737 .04 509
24 Creosote paint " gallon 703 .70 492
25 Tunnel Sign-C.S. 9 " Each 2 1.00 2
26 Pump fire extinguisher (5 gallon Pyrene) 1927 " 4 20.00 80
27 Fire Ladders 24 ft. " " 2 6.00 12
28 Fire Ladders 16 ft. " " 3 4.00 12
29 Fire barrels & covers-concrete " " 8 5.00 40
30 Fire buckets-metal, cone shaped " " 12 .25 3
31 Axes, single bitt " " 4 1.00 4

32 ..........Total

$410,889.64
33 ..........Interest during construction

$22,512.11
34 ..........Final

$433,401.75