ICC Valuation Report

Statement showing property changes from September 1, 1926, to December 31, 1927

line
#
Character of property and description
Date
Units
Number of
units
Cost/unit
$$$
Total
$$$
1 Account No. 5 Title Tunnels and Subways




2 Tunnel No.15 MP 553.9 Single Track Driven




3 Total Length 150ft. (sta. "D" 1165+80 to "D" 1164+30)




4 Lined Length concrete-24 ft. per plans 18653




5 Lined Length timber-120 ft.




6 Two concrete portals, plans 18247




7 Excavation-solid rock
Cu Yd 2,703 3.70 10,001
8 Portal backfill-Loose rock
" 114 .49 56

9 -Lining-




10 ...Reinforced concrete 1926 " 144 13.00 1,872
11 ...Plain concrete " " 126 11.50 1,449
12 ...Timber-untreated fir " m.b.m. 38.527 40.00 1,541
13 ...Timber-Redwood " " 1.040 45.00 47

14 Packing-cordwood " cord 28 7.00 196
15 Reinforcing bars " lbs. 4,843 .04 194
16 Iron " " 448 .05 22
17 Creosote paint " gallon 33 .70 23
18 Tunnel Sign-C.S. 9 " Each 2 1.00 2
19 Pump fire extinguisher (5 gallon Pyrene) 1927 " 2 20.00 40
20 Fire Ladders 24 ft. " " 1 6.00 6
21 Fire Ladders 16 ft. " " 1 4.00 4
22 Fire barrels & covers-concrete " " 4 5.00 20
23 Fire buckets-metal, cone shaped " " 8 .25 2
24 Axes, single bitt " " 2 1.00 2

25 ..........Total

$19,342.66
26 ..........Interest during construction

$1,055.13
27 ..........Final

$20,397.79