| Tunnel #15 |

West Portal of Tunnel #15
Statement showing property changes from September 1, 1926, to December 31, 1927 |
||||||
line |
Character of property and description |
Date |
Units |
Number of |
Cost/unit |
Total |
| 1 | Account No. 5 Title Tunnels and Subways | |||||
| 2 | Tunnel No.15 MP 553.9 Single Track Driven | |||||
| 3 | Total Length 150ft. (sta. "D" 1165+80 to "D" 1164+30) | |||||
| 4 | Lined Length concrete-24 ft. per plans 18653 | |||||
| 5 | Lined Length timber-120 ft. | |||||
| 6 | Two concrete portals, plans 18247 | |||||
| 7 | Excavation-solid rock | Cu Yd | 2,703 | 3.70 | 10,001 | |
| 8 | Portal backfill-Loose rock | " | 114 | .49 | 56 | |
| 9 | -Lining- | |||||
| 10 | ...Reinforced concrete | 1926 | " | 144 | 13.00 | 1,872 |
| 11 | ...Plain concrete | " | " | 126 | 11.50 | 1,449 |
| 12 | ...Timber-untreated fir | " | m.b.m. | 38.527 | 40.00 | 1,541 |
| 13 | ...Timber-Redwood | " | " | 1.040 | 45.00 | 47 |
| 14 | Packing-cordwood | " | cord | 28 | 7.00 | 196 |
| 15 | Reinforcing bars | " | lbs. | 4,843 | .04 | 194 |
| 16 | Iron | " | " | 448 | .05 | 22 |
| 17 | Creosote paint | " | gallon | 33 | .70 | 23 |
| 18 | Tunnel Sign-C.S. 9 | " | Each | 2 | 1.00 | 2 |
| 19 | Pump fire extinguisher (5 gallon Pyrene) | 1927 | " | 2 | 20.00 | 40 |
| 20 | Fire Ladders 24 ft. | " | " | 1 | 6.00 | 6 |
| 21 | Fire Ladders 16 ft. | " | " | 1 | 4.00 | 4 |
| 22 | Fire barrels & covers-concrete | " | " | 4 | 5.00 | 20 |
| 23 | Fire buckets-metal, cone shaped | " | " | 8 | .25 | 2 |
| 24 | Axes, single bitt | " | " | 2 | 1.00 | 2 |
| 25 | ..........Total | $19,342.66 | ||||
| 26 | ..........Interest during construction | $1,055.13 | ||||
| 27 | ..........Final | $20,397.79 | ||||