ICC Valuation Report

Statement showing property changes from September 1, 1926, to December 31, 1927

line
#
Character of property and description
Date
Units
Number of
units
Cost/unit
$$$
Total
$$$
1 Account No. 5 Title Tunnels and Subways




2 Tunnel No.14 MP 551.8 Single Track Driven




3 Total Length 2121ft. (sta. "K" 1070+31 to "K" 1049+10)




4 Lined Length concrete-226 ft. per plans 18653 & C.S.347




5 Lined Length timber-2098 ft.




6 Two concrete portals, plans 18247,40613 & 40615




7 Excavation-solid rock
Cu Yd 41,638 3.70 154,061
8 Excavation-solid rock (invert)
" 155 2.50 388
9 Overhaul
Cu Yd Sta 36,286 .0125 454
10 Portal backfill-common
Cu Yd 52 .24 12
11 Portal backfill-Loose rock
" 23 .49 11

12 -Lining-




13 ...Reinforced concrete 1926 " 822 13.00 10,686
14 ...Plain concrete " " 403 11.50 4,635
15 ...Plain concrete (invert) " " 112 11.50 1,288
16 ...Timber-untreated fir " m.b.m. 844.621 40.00 33,785
17 ...Timber-Redwood " " 18.170 45.00 818

18 Packing-cordwood " cord 996 7.00 6,972
19 Reinforcing bars " lbs. 72,476 .04 2,899
20 Iron " " 6,030 .05 302
21 Creosote paint " gallon 589 .70 412
22 Tunnel Sign-C.S. 9 " Each 2 1.00 2
23 Pump fire extinguisher (5 gallon Pyrene) 1927 " 2 20.00 40
24 Patrol Fire (2 1/2 Gallon) " " 1 10.50 11
25 Fire Ladders 24 ft. " " 2 6.00 12
26 Fire Ladders 16 ft. " " 1 4.00 4
27 Fire barrels & covers-concrete " " 4 5.00 20
28 Fire buckets-metal, cone shaped " " 12 .25 3
29 Axes, single bitt " " 4 1.00 4

30 ..........Total

$303,497.35
31 ..........Interest during construction

$16,625.33
32 ..........Final

$320,122.68