Construction
MP 611.16


View of upstream side of bridge, during high water, looking toward Portland. October 29, 1950.

At Milepost 611.16, a single Through Plate Girder Span crosses one of 2 overflow channels for the Willamette River. This bridge is located between the Willamette River bridge and the east switch Dougren. The bridge consists of 1 80' Through Plate Girder span with an E-72 loading. Work started on September 5, 1950 and was completed on October 12, 1950.


Downstream side.



Welcome to Joel's Southern Pacific in The Cascades! If you were directed to this portion of the webpage from an outside source, such as a different webpage, then please click the photo below to go the SP in The Cascades home page.

© Joel Ashcroft